Thursday, June 11, 2009

June 2-9, 2009

Cabin has survived the winter well. No roof leaks but the indoor plumbing took a hit. serveral frost breaks were repaired with PEX plasitc piping. All leaks were fixed and water supply is working.
Weather was cold and rainy.


Also installed metal roofing until the bolt and washer supply was exhausted. Other tha the deck roof (not built yet), only a small portion of the exiting building roof needs to be completed.











For the first several days the rain kept work to inside except between showers the deck floor was installed. Completed deck floor with treated planks and left over treated plywood.

No comments: