Tuesday, October 27, 2009

October 21-25, 2009











The loft area before the windows and drywall were installed and the support frame dismantled. Unfortunately, in our haste to "hit the road", we did not take a photo of the progress on the loft but "it looks good".



















































A warm fire keep the construction gang from being too grouchy and and suffering from frost bite.












Thursday, September 3, 2009

August 27 - Sept 4, 2009 - Interior Walls


A comfortable bed. Note the bed frame fashioned with bags of insulation.





This is not what it looks like (city workers ... one working and the rest looking). The Drywall installers were very busy beavers. It the electrician who was a bit on the lazy side.















Thursday, August 27, 2009

Gooliaff's Week 2009 - by Angela


He caught a shrew in the addition and thought that he done a day's work!!


Pictures taken on a canoe excursion. Beautiful scenery----makes all the work worthwhile. We didn't get alot done but had fun!




















Great ride on Marv and Gloria's boat---Thank you











Frog in habitat---endangered Northern Leopard frog spotted at the marina.





Sunday, August 16, 2009

August 7-15, 2009 Painting the Ceiling


Neighbour Wayne and Linda's cabin being moved to F.A.T.S. camp to make room for a new structure.








Installing the electical ground plate.

















Painting crew, Justin, Trevor and Jay. Missing is Gloria who supervised all the weeklong painting of the ceiling in the new addition as well as the deck.


























Thursday, August 6, 2009

July 24-28, 2009 Starting the finishing inside.

Sandy beach near The Hook. Bush pies were on the menu.


New overhead windows were installed
Bedroom cieling installed.



Sunday, July 26, 2009

July 15-24, 2009 - Install windows, roof and electrical

A wicked storm including hail the size of large marbles (couple inches in 45 minutes).

Work load:
1. Electrical wiring
2. Windows, patio door and outside door installed.
3. Reconfigured new bath room to comply with service and subpanel location.
4. Completed roofing including roof cap.
5. A successfull R&R fishing to Split Rock.
6. Loaded unused lumber on flatbed to be returned to Cec's barn for storage.
7. Trusty horse trailer turned transport trailer returned home.

The downpour provided a leak test for the new roof. yipee .. no leaks










A successful fishing trip to Split Rock. Cec caught a 4 pound pickeral and yes Pop is frozen. It took a warm fire to get the ciculation back.




Friday, July 10, 2009

June 25 - July 9, 2009 Deck Phase of Project

The completed deck with the railing to be added sometime in the future. We literally finished installing the metal roofing in a light rain but for a change did not have to tarp the roof. The rain continued into the evening into the next day. The deck was christened with a liquid libation under a dry roof.










One poplar tree had to be cut down to accomodate the overhang of the deck roof. A rope attached to the skidsteer felled the tree in the proper direction.