Sunday, July 26, 2009

July 15-24, 2009 - Install windows, roof and electrical

A wicked storm including hail the size of large marbles (couple inches in 45 minutes).

Work load:
1. Electrical wiring
2. Windows, patio door and outside door installed.
3. Reconfigured new bath room to comply with service and subpanel location.
4. Completed roofing including roof cap.
5. A successfull R&R fishing to Split Rock.
6. Loaded unused lumber on flatbed to be returned to Cec's barn for storage.
7. Trusty horse trailer turned transport trailer returned home.

The downpour provided a leak test for the new roof. yipee .. no leaks










A successful fishing trip to Split Rock. Cec caught a 4 pound pickeral and yes Pop is frozen. It took a warm fire to get the ciculation back.




No comments: