A wicked storm including hail the size of large marbles (couple inches in 45 minutes).
Work load:
1. Electrical wiring
2. Windows, patio door and outside door installed.
3. Reconfigured new bath room to comply with service and subpanel location.
4. Completed roofing including roof cap.
5. A successfull R&R fishing to Split Rock.
6. Loaded unused lumber on flatbed to be returned to Cec's barn for storage.
7. Trusty horse trailer turned transport trailer returned home.
The downpour provided a leak test for the new roof. yipee .. no leaks
Sunday, July 26, 2009
Friday, July 10, 2009
June 25 - July 9, 2009 Deck Phase of Project
The completed deck with the railing to be added sometime in the future. We literally finished installing the metal roofing in a light rain but for a change did not have to tarp the roof. The rain continued into the evening into the next day. The deck was christened with a liquid libation under a dry roof.