After the trees were cleared, the roots were dislodged with a backhoe hired from FATS camp.
Over the years the cabin had sunk into the muskeg. Jacks were used to lift the structure before a permanent foundation could to built.
Sister and Ceasar (Gus's dogs) survey the mess created by the backhoe.
The day it rained 41/2 inches resulting in a soggy mess. Rubber boots were a necessity.
When the exsting well could not revivied, a new sand point well was installed. Cec is digging the trench from the well to the side of the cabin for the piping..
No comments:
Post a Comment