The first week of October offered 3 days of nice
sunny weather allowing the roof above the
vol ted ceiling to have the rafters put up (
mucho heavy), rough wiring for
inside lights and then sheeted (in the dark with lights up on a roof proved rather interesting). The weather
forecast predicted rain, so tarps were put down (also at night) That evening the rains came and there was water
leaking into the
everywhere.
However, as the saying goes, it was a warm rain and the final portion of the roof was
complete sheeted and
tarped. It snowed two days later. Hopefully the tarps held the H2O out.